Documentation
Onboarding
Getting Started
Power & Battery
Hardware & Components
Build & Assembly
Radio & RF Design
Frequencies & Regulations
Firmware & Software
USB & Connectivity
GPS & Navigation
Morse & Communication
Modes & Operation
Field Operations & Rescue
Building Effectively
Build Variants
Project & Reference

Trip Planning

Edit on GitHub

Planning a trip with a beacon: route information, the beacon plan, and the paperwork that turns a device into a rescue asset.

Trip Planning

The beacon is only as good as the plan around it. This page is the planning checklist that makes the beacon useful to the people who will look for you.

The beacon plan

Before any trip, write down and share:

  1. Channel and frequency: what the beacon transmits on, and the schedule
  2. Payload: the callsign/name and coordinates it sends
  3. Entry and exit: trailhead coordinates, planned route, expected return time
  4. Contact: who to call if the return time passes (see Emergency Communications Plan)

The route sheet

Even with a beacon, leave a route sheet with someone trusted: start point, planned points, bivouac or hut nights, and the return time plus a 2-hour grace. The sheet is the search planner’s primary data, more valuable than the beacon’s existence.

Pre-flight the beacon

  • Charge the cell and confirm the voltage
  • Confirm the payload (callsign, coordinates) is current
  • Test one transmission into a second beacon or SDR
  • Check the case seals and antenna mount

The 24-hour rule

Review the beacon plan before every trip, even short ones. Settings drift, cells age, and the last trip’s configuration is not this trip’s configuration. The Pre Trip Checklist has the full routine.